Main Panel Upgrade in Sacramento & Northern California

Some houses need the service side modernised before anything new can be connected. We do that as part of the project, not as a separate errand.

Licensed, bonded & insuredSmall, local team25-year panel warranty10-year workmanship warrantySe habla español

Who needs one

Four panels that usually have to go.

If yours is on this list, it comes up during design rather than on install day.

Older, smaller service

Homes still on 100 amps often run out of capacity the moment storage, a heat pump or a car charger enters the picture.

No space left

A panel with every slot filled, doubled-up breakers or a tandem stack cannot take a new solar or storage circuit safely.

Discontinued equipment

Certain older brands and panel designs are no longer supported and are routinely flagged. Replacement is the practical fix.

Plans that add load

Two EVs, an induction range, a shop, a pool pump. Sizing the service once for all of it is cheaper than touching it twice.

new service panel wired and labelled

Sun Worx installation

What is included

A service that fits the house you have now.

Done once, labelled properly, and built with the next decade in mind.

Load calculation

A real calculation of existing and planned load, which is what determines the service size — not a round number picked in the driveway.

Modern 200-amp service

New panel, new main breaker and a proper grounding and bonding scheme, with capacity left for what comes next.

EV-ready capacity

Room for one or two chargers designed in now, so a future circuit is a breaker and a run rather than another upgrade.

Meter and utility coordination

Panel changes mean scheduling a disconnect and reconnect with your utility. We book it and work to their window.

Permit and inspection

The electrical permit, the inspection and any corrections are ours to carry, start to finish.

A labelled panel

Every circuit identified and a schedule inside the door, so the next person working on the house is not guessing.

How it works

Six steps, one power-down.

The house is off for part of a day. Everything around that is scheduling.

  1. 01

    Look and load count

    We photograph the existing panel, check the service conductors and count real load against what you plan to add.

  2. 02

    Size and scope

    Panel size, location, whether the meter combination changes, and what the utility will require at the connection point.

  3. 03

    Utility and permit filing

    The electrical permit goes to the building department and the service request to the utility, timed so neither one holds up the other.

  4. 04

    Utility disconnect scheduled

    Your power gets cut for the swap. We give you the window in advance so you can plan around refrigerators and work calls.

  5. 05

    Swap day

    Old panel out, new gear set, conductors terminated, grounding corrected, circuits labelled as they are reconnected.

  6. 06

    Inspection and reconnect

    Inspector signs it off, the utility reconnects, and we walk the panel with you before the truck leaves.

Equipment and warranty

What goes in, and what we stand behind.

Service panelA modern 200-amp panel and main breaker, sized from the load calculation for the house.
GroundingGrounding and bonding brought to current code, which is often the quiet half of the job.
EV capacitySpace and capacity reserved for charging, so the next circuit does not mean another upgrade.
WorkmanshipTen years on our work, including conduit, terminations and any penetration we make.
CoordinationPermit, inspection and the utility disconnect and reconnect are all scheduled by us.

All electrical and roofing work is performed by appropriately licensed professionals.

Money and rules

Where an upgrade fits in the incentive picture.

A panel upgrade is rarely its own incentive story; it is usually what makes the storage or solar project possible, and the programs sit on that side. SMUD battery rebates of up to $6,000 and the statewide Self-Generation Incentive Program both attach to qualifying storage, and the 30% federal credit for purchased home solar ended on December 31, 2025, with some third-party-owned lease and PPA programs still able to apply a federal credit through 2027.

Whether panel work can ride along inside a larger project’s eligibility depends on the program and the scope. We look at that combination at the quote instead of assuming it.

Questions

Panel upgrade questions.

How long will my power be off?

Most of a working day. We give you the window ahead of time, and the crew works to it rather than to a vague afternoon.

Do I definitely need an upgrade for solar?

No. Plenty of houses have room as they stand. We check capacity during design and tell you either way — an unnecessary upgrade is not a service.

Does the panel have to stay in the same spot?

Not always. Sometimes moving it improves access, conduit runs and clearances. The utility has the final word on where the service can land.

Will this make the house EV-ready?

That is the point of doing it once. We size for charging you are planning so a future circuit is a simple addition.

Can the upgrade happen on install week?

Often yes, which is the cheapest way to do it. It depends mostly on when the utility can schedule the disconnect.

Related work.

Solar InstallationBattery StorageAdd a Battery to Existing SolarContact

Send a photo of your panel.

The panel door open, the label visible, and what you are planning to add. We tell you whether it needs replacing.

Or call or text 510-773-1922. By submitting, you agree Sun Worx may call or text you about your request.

No pressure, no fee
We check your utility and programs
English or Spanish

Based in Sacramento, serving Northern California. Call or text 510-773-1922 or email sunworxca@gmail.com.

Call Text Book