Skip to content
SMUD customers: battery rebates up to $6,000 · See if you qualify ›
510-773-1922 Get a Free Quote EnglishEspañol
Call EnglishEspañol Español

A Smaller, Local Solar & Battery Company in Sacramento

A small, licensed local team, one steady crew, and every stage of the project handled in-house.

Get a Free QuoteCall 510-773-1922
Licensed, bonded & insuredSmall, local team25-year panel warranty10-year workmanship warrantySe habla español

Who we are

One team, from the first call to the last signature.

Sun Worx works out of Sacramento. We are a small, licensed California company, and our team carries the job the whole way: the phone call, the design, the day the crew is on your property, and the walk-through with the inspector at the end.

There is no call center and no sales pressure. Three months after your system is switched on, if something looks odd in the app, the number you call is the same number you called the first time.

What we handle

Six stages, and we own every one of them.

  1. 01

    Quote and bill review

    We go through twelve months of your power bills and work out what the house really uses before anyone mentions equipment.

  2. 02

    Design and engineering

    Roof planes, shade, structural detail and layout — drawn the way your city plan-checker expects to receive it.

  3. 03

    Financing help

    Financing available (on approved credit). We explain the shape of each route so none of the paperwork is a surprise.

  4. 04

    Permits and filings

    The building permit and the interconnection application both go out from our desk, and we track them until they clear.

  5. 05

    Installation

    Mounts, flashing, conduit, microinverters and battery, installed by the same crew we work with week after week.

  6. 06

    Training and sign-off

    You learn the monitoring app while we are still on site, then we meet the inspector and close the permit out.

Equipment

We would rather quote less and install better.

Panels with a 25-year warranty

We only quote premium panels backed by a 25-year manufacturer warranty. A cheap panel is cheap once. You live above it for decades.

Enphase microinverters

One microinverter per panel: panel-level monitoring, built-in rapid shutdown for firefighter safety, and no single box whose failure takes the whole array down.

Enphase or FranklinWH batteries

Two battery lines we know well, both carrying a 10-year manufacturer warranty. We size them around what you want running during an outage.

Our promise

Four things you can hold us to.

We show up

If we said Tuesday morning, we are there Tuesday morning — and if something moves, you hear it from us before you have to ask.

We tell you the truth

Including the version where solar is not worth doing at your house yet. That answer costs us a sale and saves you money.

No pressure

The quote is yours to sit with. Nobody will call you three times a week about a discount that expires on Friday.

We come back

If something we installed is not right, we return and make it right. That is what a workmanship warranty is supposed to mean.

The trades we bring in

Panel work and roofs, handled inside your project.

Some houses need the main electrical panel replaced before a battery can be connected. Others need a new roof before anything should be mounted on it at all. Sun Worx arranges both as part of the same project, on one schedule, instead of handing you a list of phone numbers and wishing you luck.

All electrical and roofing work is performed by appropriately licensed professionals.

a finished Sun Worx install, shot wide

Sun Worx installation

En español

Se habla español, de principio a fin.

Atendemos a familias de habla hispana en su idioma: la cotización, el contrato, los permisos y la capacitación sobre su sistema. Nadie tiene que traer a un hijo a traducir.

Ver esta página en español ›

Where we work

Six regions, and we drive to all of them.

Sacramento AreaPlacer & El DoradoYolo, Yuba & SutterSan Joaquin CountySolano CountyEast Contra CostaAll service areas ›

Questions

Things people ask before they hire us.

How long does the whole project take, start to finish?

The install itself is short. What takes time is the paperwork around it — the building permit and your utility's approval to switch the system on. Those timelines belong to the city and the utility, not to us, so we do not promise a date we cannot control. What we do promise is that you never have to chase either one; that is our job, and we tell you where it stands.

What happens at the final inspection?

A city inspector comes out, checks that the work matches the approved plans, and signs it off. We meet them there and answer their questions so you do not have to take the day off. After sign-off, the utility grants permission to operate and the system goes live.

Does my electrical panel need to be upgraded?

Sometimes. Older 100-amp panels, panels with no room left for breakers, and a few discontinued panel brands all have to be dealt with before a battery or a large array can be connected. We look at yours during the quote and tell you plainly whether it is needed.

¿Hablan español?

Sí. Atendemos en español de principio a fin — la cotización, el contrato, los trámites y la capacitación sobre su sistema.

Talk to the team who will do the work.

Send the basics and our team calls you back — usually the same day.

Or call or text 510-773-1922. By submitting, you agree Sun Worx may call or text you about your request.

No pressure, no fee
We check your utility and programs
English or Spanish

Based in Sacramento, serving Northern California. Call or text 510-773-1922 or email sunworxca@gmail.com.

Call Text Book